4.7 Article

Unwelcome environmental impact assessment for coastal protection along a 7-km shoreline in Southern Thailand

期刊

OCEAN & COASTAL MANAGEMENT
卷 61, 期 -, 页码 20-29

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ocecoaman.2012.02.008

关键词

-

资金

  1. KasetsartUniversity, Sri Racha Campus [009/2554]

向作者/读者索取更多资源

Environmental Impact Assessment (EIA) is needed for development projects that may have negative impacts on people and environment. A screening procedure plays a crucial role in determining whether an EIA is required for a particular proposal. Misjudging the EIA requirement results in the unnecessary EIA being undertaken and causes mental anguish to the people who are in trouble because carrying out the EIA takes a long time. This article presents a case study of coastal protection by detached breakwaters in Nakhon Si Thammarat province, Thailand, where an initial environmental examination found no significant environmental impact and the EIA was deemed unnecessary by coastal communities. After an engineering design of the detached breakwaters had been completed, the people, whose houses and properties were at risk of sinking into the sea, had to wait one more year for the EIA to be completed. The willingness to pay (WTP) of the people affected to bypass the EIA was measured by a single-bounded dichotomous choice approach. Their mental pain caused by waiting for the detached breakwaters was equated to aggregated WTP which was about US$ 724,160. Such a large WTP from the poor coastal dwellers sends an urgent message that the categorical screening in Thailand's EIA legislation may need some adjustments. (C) 2012 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据