期刊
出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.nimb.2009.10.054
关键词
AMS; Facility report; Be-10; Al-26; Tandem
The setups for the Be-10 and Al-26 AMS measurements at the Zurich 6 MV EN Tandem AMS facility are presented and data analysis procedures for both radionuclides are discussed. Performance parameters of the system are shown. In-house AMS standards are compared to commercially available AMS standards. (C) 2009 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据