期刊
MINERALS ENGINEERING
卷 127, 期 -, 页码 122-124出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.mineng.2018.08.012
关键词
Hydrometallurgy; Leaching; Gibbsite precipitation; Waste recycling
资金
- Center for Resource Recovery and Recycling (CR3) [NSF 233110]
The disposal of aluminum bearing dust can cause heat and gases, as well as the potential generation of leachate from landfills. In this research, we suggested a two-step process - leaching and precipitation - for recovering gibbsite from secondary aluminum production dust. First, a sodium eliminate solution, containing about 20 g/L of aluminum, was prepared using 1 M of sodium hydroxide leaching. Precipitation of the gibbsite was then conducted for 30 min after a pH adjustment. As the results indicate, the overall aluminum recovery rate was about 87% by weight after leaching and precipitation, and the major component of the precipitate was Al(OH)(3) based on an X-ray diffraction(XRD) analysis.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据