4.7 Article

Recovery of gibbsite from secondary aluminum production dust by caustic leaching

期刊

MINERALS ENGINEERING
卷 127, 期 -, 页码 122-124

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.mineng.2018.08.012

关键词

Hydrometallurgy; Leaching; Gibbsite precipitation; Waste recycling

资金

  1. Center for Resource Recovery and Recycling (CR3) [NSF 233110]

向作者/读者索取更多资源

The disposal of aluminum bearing dust can cause heat and gases, as well as the potential generation of leachate from landfills. In this research, we suggested a two-step process - leaching and precipitation - for recovering gibbsite from secondary aluminum production dust. First, a sodium eliminate solution, containing about 20 g/L of aluminum, was prepared using 1 M of sodium hydroxide leaching. Precipitation of the gibbsite was then conducted for 30 min after a pH adjustment. As the results indicate, the overall aluminum recovery rate was about 87% by weight after leaching and precipitation, and the major component of the precipitate was Al(OH)(3) based on an X-ray diffraction(XRD) analysis.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据