Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table

期刊

MATHEMATICAL PROBLEMS IN ENGINEERING
卷 2014, 期 -, 页码 -

出版社

HINDAWI LTD
DOI: 10.1155/2014/727964

关键词

-

资金

  1. National Science Foundation of China (NSFC) [50908171]
  2. Shanghai Municipal Science and Technology Commission [13ZR1443800]

向作者/读者索取更多资源

By FE simulation with Mohr-Coulomb perfect elastoplasticity model, the relationship between the support pressure and displacement of the shield tunnel face was obtained. According to the plastic strain distribution at collapse state, an appropriate failure mechanism was proposed for upper bound limit analysis, and the formula to calculate the limit support pressure was deduced. The limit support pressure was rearranged to be the summation of soil cohesion c, surcharge load q, and soil gravity gamma multiplied by their corresponding coefficients N-c, N-q and N-gamma, and parametric studies were carried out on these coefficients. In order to consider the influence of seepage on the face stability, the pore water pressure distribution and the seepage force on the tunnel face were obtained by FE simulation. After adding the power of seepage force into the equation of the upper bound limit analysis, the total limit support pressure for stabilizing the tunnel face under seepage condition was obtained. The total limit support pressure was shown to increase almost linearly with the water table.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据