相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
Jun-Qing Li et al.
APPLIED MATHEMATICAL MODELLING (2014)
Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
Rachid Benmansour et al.
COMPUTERS & OPERATIONS RESEARCH (2014)
An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem
Hany Seidgar et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2014)
A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem
Hong-Sen Yan et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2014)
Meta-heuristics for the distributed two-stage assembly scheduling problem with bi-criteria of makespan and mean completion time
Fuli Xiong et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2014)
Hybrid Evolutionary Algorithm for job scheduling under machine maintenance
Ruhul Sarker et al.
APPLIED SOFT COMPUTING (2013)
Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming
Kamran S. Moghaddam
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2013)
Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
A. Mozdgir et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2013)
Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
Vahid Majazi Dalfard et al.
COMPUTERS & MATHEMATICS WITH APPLICATIONS (2012)
A reliability/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services
Hadi Mokhtari et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2012)
Production rescheduling for machine breakdown at a job shop
Yao-Hsiang Dong et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2012)
Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
F. J. Hwang et al.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2012)
Incorporating periodic preventive maintenance into flexible flowshop scheduling problems
B. Naderi et al.
APPLIED SOFT COMPUTING (2011)
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
E. Moradi et al.
EXPERT SYSTEMS WITH APPLICATIONS (2011)
A genetic algorithm for JIT single machine scheduling with preemption and machine idle time
H. Khorshidian et al.
EXPERT SYSTEMS WITH APPLICATIONS (2011)
A hybrid method for flowshops scheduling with condition-based maintenance constraint and machines breakdown
Ehram Safari et al.
EXPERT SYSTEMS WITH APPLICATIONS (2011)
Scheduling stochastic job shop subject to random breakdown to minimize makespan
Deming Lei
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2011)
Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm
Nasr Al-Hinai et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2011)
A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
E. Shokrollahpour et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2011)
Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
E. Torabzadeh et al.
ADVANCES IN ENGINEERING SOFTWARE (2010)
Analysis of robustness in proactive scheduling: A graphical approach
Feiza Ghezail et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2010)
Multi-objective scheduling of dynamic job shop using variable neighborhood search
M. A. Adibi et al.
EXPERT SYSTEMS WITH APPLICATIONS (2010)
Dynamic job shop scheduling using variable neighbourhood search
M. Zandieh et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2010)
Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints
F. Jabbarizadeh et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2009)
The two-stage assembly scheduling problem to minimize total completion time with setup times
Ali Allahverdi et al.
COMPUTERS & OPERATIONS RESEARCH (2009)
Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
M. Gholami et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2009)
An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
M. Zandieh et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2009)
Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
A. Berrichi et al.
JOURNAL OF INTELLIGENT MANUFACTURING (2009)
Considering scheduling and preventive maintenance in the flowshop sequencing problem
Ruben Ruiz et al.
COMPUTERS & OPERATIONS RESEARCH (2007)
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
Fawaz S. Al-Anzi et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
Ali Allahverdi et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2006)
Maintenance scheduling and production control of multiple-machine manufacturing systems
A Gharbi et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2005)
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
H Allaoui et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2004)
Scheduling flexible flow lines with sequence-dependent setup times
ME Kurz et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
CR Cassady et al.
IIE TRANSACTIONS (2003)
Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
X Sun et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2003)
A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
A Tozkapan et al.
COMPUTERS & OPERATIONS RESEARCH (2003)
Rescheduling manufacturing systems: A framework of strategies, policies, and methods
GE Vieira et al.
JOURNAL OF SCHEDULING (2003)
A survey of maintenance policies of deteriorating systems
HZ Wang
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)
Using real time information for effective dynamic scheduling
P Cowling et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)
Two-machine flow shops with limited machine availability
W Kubiak et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)
Heuristic algorithms for the two-machine flowshop with limited machine availability
J Blazewicz et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2001)