4.2 Article

A case study for advanced planning and scheduling (APS)

期刊

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s11518-011-5180-z

关键词

Advanced planning and scheduling; case study; intelligent heuristic

资金

  1. National Natural Science Foundation of China [70901021, 61174171, 71171040]
  2. Social Science Foundation of the Ministry of Education of China [10YJC630139]
  3. Foundation for University Outstanding Young Researchers of Fujian Province of China [JA10023S]

向作者/读者索取更多资源

This paper presents a case study for the advanced planning and scheduling (APS) problem encountered in a light source manufacturer. The APS problem explicitly considers due dates of products, operation sequences among items, and capacity constraints of the manufacturing system. The objective of the problem is to seek the minimum cost of both production idle time and tardiness or earliness penalty of an order. An intelligent heuristic is applied to the problem, and the results demonstrate that significant production performances can be achieved while ensuring customer satisfaction as opposed to normal practices followed in the company relying on human expertise.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据