4.4 Article

Improved differential evolution algorithm for resource-constrained project scheduling problem

期刊

出版社

SYSTEMS ENGINEERING & ELECTRONICS, EDITORIAL DEPT
DOI: 10.3969/j.issn.1004-4132.2010.05.013

关键词

differential evolution algorithm; project scheduling; resource constraint; priority-based scheduling

资金

  1. National Natural Science Foundation of China [60835004, 60775047, 60974048]
  2. National High Technology Research and Development Program of China [2007AA04Z244, 2008AA04Z214]
  3. Natural Science Foundation of Hunan Province [09JJ9012]
  4. Hunan Provincial Education Department [08C337]

向作者/读者索取更多资源

An improved differential evolution (IDE) algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem (RCPSP) with the objective of minimizing project duration. Activities priorities for scheduling are represented by individual vectors and a serial scheme is utilized to transform the individual-represented priorities to a feasible schedule according to the precedence and resource constraints so as to be evaluated. To investigate the performance of the IDE-based approach for the RCPSP, it is compared against the meta-heuristic methods of hybrid genetic algorithm (HGA), particle swarm optimization (PSO) and several well selected heuristics. The results show that the proposed scheduling method is better than general heuristic rules and is able to obtain the same optimal result as the HGA and PSO approaches but more efficient than the two algorithms.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据