4.6 Article

Use of programmable versus nonprogrammable shunts in the management of hydrocephalus secondary to aneurysmal subarachnoid hemorrhage: a retrospective study with cost-benefit analysis

期刊

JOURNAL OF NEUROSURGERY
卷 121, 期 4, 页码 899-903

出版社

AMER ASSOC NEUROLOGICAL SURGEONS
DOI: 10.3171/2014.3.JNS131088

关键词

shunt; hydrocephalus; subarachnoid hemorrhage; cost analysis; vascular disorders

向作者/读者索取更多资源

Object. The choice of programmable or nonprogrammable shunts for the management of hydrocephalus after aneurysmal subarachnoid hemorrhage (SAH) remains undefined. Variable intracranial pressures make optimal management difficult. Programmable shunts have been shown to reduce problems with drainage, but at 3 times the cost. of nonprogrammable shunts. Methods. All patients who underwent insertion of a ventriculoperitoneal shunt for hydrocephalus after aneurysmal SAH between 2006 and 2012 were included. Patients were divided into those in whom nonprogrammable shunts and those in whom programmable shunts were inserted. The rates of shunt revisions, the reasons for adjustments of shunt settings in patients with programmable devices, and the effectiveness of the adjustments were analyzed. A cost-benefit analysis was also conducted to determine if the overall cost for programmable shunts was more than for nonprogrammable shunts. Results. Ninety-four patients underwent insertion of shunts for hydrocephalus secondary to SAH. In 37 of these patients, nonprogrammable shunts were inserted, whereas in 57 programmable shunts were inserted. Four (7%) of 57 patients with programmable devices underwent shunt revision, whereas 8 (21.6%) of 37 patients with nonprogrammable shunts underwent shunt revision (p = 0.0413), and 4 of these patients had programmable shunts inserted during shunt revision. In 33 of 57 patients with programmable shunts, adjustments were made. The adjustments were for a trial of functional improvement (n = 21), overdrainage (n = 5), underdrainage (n = 6), or overly sunken skull defect (n = 1). Of these 33 patients, 24 showed neurologioal improvements (p = 0.012). Cost-benefit analysis showed $646.60 savings (US dollars) per patient if programmable shunts were used, because the cost of shunt revision is a lot higher than the cost of the shunt. Conclusions. The rate of shunt revision is lower in patients with programmable devices, and these are therefore more cost-effective. In addition, the shunt adjustments made for patients with programmable devices also resulted in better neurological outcomes.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据