4.7 Article

Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing

期刊

JOURNAL OF MANUFACTURING SYSTEMS
卷 29, 期 1, 页码 1-9

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.jmsy.2010.06.004

关键词

-

资金

  1. University of Tehran [8106043/1/13]

向作者/读者索取更多资源

This paper presents a new nonlinear multi-objective mathematical model for a single-machine scheduling problem with three objectives: (1) minimizing the sum of the weighted jobs completion, (2) minimizing the sum of the weighted delay times, and (3) maximizing the sum of the job values in makespan. In addition, a number of constraints are incorporated in this presented model, such as repairing and maintenance periods, deterioration of jobs, and learning effect of the work process. Since this type of scheduling problem belongs to a class of NP-hard ones, its solution by common software packages is almost impossible, or at best very time consuming. Thus, a meta-heuristic algorithm based on simulated annealing (SA) is proposed to solve such a hard problem. At a final stage, the related results obtained by the proposed SA are compared with those results reported by the Lingo 8 software in order to demonstrate the efficiency and capability of our proposed SA algorithm. (C) 2010 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据