4.7 Article

Simultaneous optimization of repair and control-limit policy in condition-based maintenance

期刊

JOURNAL OF INTELLIGENT MANUFACTURING
卷 28, 期 1, 页码 245-254

出版社

SPRINGER
DOI: 10.1007/s10845-014-0974-8

关键词

Condition-based maintenance; Proportional hazard model; Control-limit policy; Repair

向作者/读者索取更多资源

In condition-based maintenance (CBM) planning, collected information from system condition monitoring is the basis of making decision about conducting the maintenance and repair activities. Recently, ample number of studies has been conducted in CBM field especially, in control-limit policy. In control-limit policy, using proportional Hazards model and results of monitoring system condition, one can estimate hazard rate function and its condition's transition probability matrix. Then, considering replacement costs, optimal control-limit can be determined minimizing the average cost in the long run. The presented model considers repair policy and their implementation cost, and the assumptions of repair during interval inspection is ignored. Then, a model is presented to determine the optimal control-limit and the best repair policy, in which the average total cost per unit time in the long-run, is minimized. At the end, a numerical example is illustrated.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据