期刊
JOURNAL OF INTELLIGENT MANUFACTURING
卷 22, 期 5, 页码 815-822出版社
SPRINGER
DOI: 10.1007/s10845-009-0370-y
关键词
Scheduling; Hybrid flowshop; Ant colony optimization; Multi-criteria
资金
- Universidad de La Sabana, Colombia [CEA-24-2008]
We consider the problem of scheduling jobs in a hybrid flowshop with two stages. Our objective is to minimize both the makespan and the total completion time of jobs. This problem has been little studied in the literature. To solve the problem, we propose an ant colony optimization procedure. Computational experiments are conducted using random-generated instances from the literature. In comparison against other well-known heuristics from the literature, experimental results show that our algorithm outperforms such heuristics.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据