Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem

期刊

JOURNAL OF INTELLIGENT MANUFACTURING
卷 20, 期 4, 页码 389-400

出版社

SPRINGER
DOI: 10.1007/s10845-008-0113-5

关键词

Production scheduling; Preventive maintenance (PM); Reliability; Multi-objective optimization; Genetic algorithms

向作者/读者索取更多资源

This paper deals with the joint production and maintenance scheduling problem according to a new bi-objective approach. This method allows the decision maker to find compromise solutions between the production objectives and maintenance ones. Reliability models are used to take into account the maintenance aspect of the problem. The aim is to simultaneously optimize two criteria: the minimization of the makespan for the production part and the minimization of the system unavailability for the maintenance side. Two decisions are taken at the same time: finding the best assignment of n jobs to m machines in order to minimize the makespan and deciding when to carry out the preventive maintenance actions in order to minimize the system unavailability. The maintenance actions numbers as well as the maintenance intervals are not fixed in advance. Two evolutionary genetic algorithms are compared to find an approximation of the Pareto-optimal front in the parallel machine case. On a large number of test instances (more than 5000), the obtained results are promising.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据