4.4 Article

Long-Lead Water Supply Forecast Using Large-Scale Climate Predictors and Independent Component Analysis

期刊

JOURNAL OF HYDROLOGIC ENGINEERING
卷 15, 期 10, 页码 744-762

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)HE.1943-5584.0000246

关键词

Snow; Climate; Forecasting; Independent component analysis; Water supply

资金

  1. NOAA-CPPA [NA07OAR4310203]

向作者/读者索取更多资源

Interest in water supply forecasting has grown prominently due to population growth and increasing demands for water. One important aspect of successfully managing the supply of water is accurate and reliable forecasts of seasonal streamflow volumes. Much of the streamflow in mountainous regions is a result of the collection of seasonal snowpack over the winter months and the melting of this snowpack over the spring and summer. However, there has been increasing pressure on operational agencies to issue longer-lead water supply forecasts that would be released in late fall or early winter preceding the runoff season. Longer-lead forecasts are difficult to make due to the uncertainty in future winter and spring climate conditions and the lack of snowpack information. During the late fall and early winter, large-scale oceanic and atmospheric information can provide insight into future climate conditions and spring runoff and have shown to be useful in developing long-lead forecast. In this study, statistical models are developed that incorporate large-scale climate signals into seasonal streamflow forecasting scheme. The objective of this study is to increase the skill of longer-lead water supply forecasts and also to increase the skill of current shorter-lead forecasts that rely on season-to-date hydroclimate information (e.g., precipitation since October, forecast month accumulated snowpack, and antecedent streamflow as a soil-moisture proxy). We employ a principal component regression model, with the addition of independent component analysis (ICA) climate predictors, for forecasting in two Pacific Northwest basins. It was found that incorporating large-scale climate predictors selected by ICA into a forecast model allowed a longer-lead-time forecast (beginning in September of previous year) and also contributed a significant amount of skill during the spring runoff season through April.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据