期刊
JOURNAL OF HAZARDOUS MATERIALS
卷 157, 期 1, 页码 69-78出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.jhazmat.2007.12.082
关键词
electrochemical wastewater treatment; optimization; response surface methodology; statistical experiment design; whey wastewater
Electrochemical treatment of deproteinated whey wastewater produced during cheese manufacture was studied as an alternative treatment method for the first time in literature. Through the preliminary batch runs, appropriate electrode material was determined as iron due to high removal efficiency of chemical oxygen demand (COD), and turbidity. The electrochemical treatment conditions were optimized through response surface methodology (RSM). where applied voltage was kept in the range, electrolyte concentration was minimized, waste concentration and COD removal percent were maximized at 25 'C. Optimum conditions at 25 'C were estimated through RSM as 11.29 V applied voltage, 100% waste concentration (containing 40 P/L lactose) and 19.87 g/L electrolyte concentration to achieve 29.27% COD removal. However, highest COD removal through the set of runs was found as 53.32% within 8 h. These results reveal the applicability of electrochemical treatment to the deproteinated whey wastewater as an alternative advanced wastewater treatment method. (c) 2007 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据