4.7 Article

Flexible interval mixed-integer bi-infinite programming for environmental systems management under uncertainty

期刊

JOURNAL OF ENVIRONMENTAL MANAGEMENT
卷 90, 期 5, 页码 1802-1813

出版社

ACADEMIC PRESS LTD- ELSEVIER SCIENCE LTD
DOI: 10.1016/j.jenvman.2008.11.006

关键词

Environmental management; Municipal solid waste; Uncertainty; Functional interval; FIMIBIP

资金

  1. Major State Basic Research Development Program [2005CB724200, 2006CB403307]
  2. Natural Science and Engineering Research Council of Canada

向作者/读者索取更多资源

A number of inexact programming methods have been developed for municipal solid waste management under uncertainty. However, most of them do not allow the parameters in the objective and constraints of a programming problem to be functional intervals (i.e., the lower and upper bounds of the intervals are functions of impact factors). In this study, a flexible interval mixed-integer bi-infinite programming (FIMIBIP) method is developed in response to the above concern. A case study is also conducted; the solutions are then compared with those obtained from interval mixed-integer bi-infinite programming (IMIBIP) and fuzzy interval mixed-integer programming (FIMIP) methods. It is indicated that the solutions through FIMIBIP can provide decision support for cost-effectively diverting municipal solid waste, and for sizing, timing and siting the facilities' expansion during the entire planning horizon. These schemes are more flexible than those identified through IMIBIP since the tolerance intervals are introduced to measure the level of constraints satisfaction. The FIMIBIP schemes may also be robust since the solutions are globally-optimal under all scenarios caused by the fluctuation of gas/energy prices, while the conventional ones are merely locally-optimal under a certain scenario. Crown Copyright (C) 2008 Published by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据