ANP Experiment for Demolition Plan Evaluation

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000791

关键词

Analytical techniques; Assessments; Decision making; Demolition; Environmental issues; Project planning and design

资金

  1. Centre for Innovative and Collaborative Engineering at Loughborough University
  2. Research Centre for Construction Innovation at Hong Kong Polytechnic University
  3. Civil Engineering Faculty at Universiti Teknologi Malaysia

向作者/读者索取更多资源

This paper presents an analytic network process (ANP) experiment for demolition plan evaluation. An experimental case study on the Warren Farm Bridge demolition project is used to demonstrate the effectiveness of an ANP model to support finding the most appropriate demolition plan. Alternative plans used in the experiment include plans that utilise deliberate collapse, progressive demolition, and deconstruction. The ANP model adopted the same assessment criteria, which were previously used in an analytic hierarchy process (AHP) model for the same evaluation purpose for the case project, in order to further make a comparison between AHP and ANP models with different evaluation results. Further to the conclusion that ANP is a viable and capable approach to demolition plan evaluation, the experiment provides a notably different result, which matches the demolition plan actually used, on the most appropriate solution for the case project in comparison with the AHP model. This study indicates that further practice oriented research is necessary through case studies and model improvement to further validate ANP's capability to support reliable decision making with regard to its inherent advantage in measuring interrelationships and interactions among evaluation criteria in a multicriteria decision-making (MCDM) model. (C) 2013 American Society of Civil Engineers.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据