JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
卷 139, 期 9, 页码 1082-1090出版社
ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000710
关键词
Infrastructure; Partnerships; Private sector; Negotiations; Portugal; Concessions; Infrastructure; Public-private partnerships; Renegotiations; Contracting
Renegotiations are frequently perceived as the Achilles' heel of concessions. After two decades of concessions development, empirical evidence suggests a recurrent need to renegotiate contracts. What drives renegotiation? Why does it occur? What are the results? The literature still lacks data on renegotiation patterns and on its main causes and results, thus not answering these questions. This paper intends to fulfill this gap by identifying some of the key determinants of renegotiations and presenting the main results. Using an econometric analysis on a real database of 87 Portuguese concessions, the research identified some variables that help explaining the high probability of renegotiation, such as the concession duration and investment, or the existence of a regulator when the contract was signed. The research also found empirical evidence of the high costs involved in renegotiations, as well as of poor control and poor management of concessions by the government.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据