Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000744

关键词

Project delivery; Innovation; Construction management; Integrated project delivery; Innovative delivery methods; Performance metrics; Contracting

资金

  1. Construction and Materials Support Center (CMSC) at the University of Wisconsin-Madison
  2. U.S. Army Research Office [W911NF-09-1-0205]

向作者/读者索取更多资源

Integrated project delivery (IPD) is an emerging construction project delivery system that collaboratively involves key participants very early in the project timeline, often before the design is started. It is distinguished by a multiparty contractual agreement that typically allows risks and rewards to be shared among project stakeholders. Because IPD is becoming increasingly popular, various organizations are expressing interest in its benefits to the architecture/engineering/construction (AEC) industry. However, no research studies have shown statistically significant performance differences between IPD and more established delivery systems. This study fills that missing gap by evaluating the performance of IPD projects compared to projects delivered using the more traditional design-bid-build, design-build, and construction management at-risk systems, and showing statistically significant improvements for IPD. Relevant literature was analyzed, and a data collection instrument was developed and utilized in detailed interviews to gather quantitative performance data from 35 recently completed projects. Univariate data analyses, such as t-tests and Mann-Whitney-Wilcoxon tests, were performed to evaluate IPD performance. The results indicate that IPD achieves statistically significant improvements in 14 metrics across six performance areas: quality, schedule, project changes, communication among stakeholders, environmental, and financial performance. The major contribution of this paper is demonstrating that IPD provides higher quality facilities faster and at no significant cost premium. These results would be extremely valuable in the hands of decision makers to enable them to choose the appropriate delivery system for their projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据