JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
卷 138, 期 1, 页码 1-13出版社
ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000390
关键词
Performance; Comparison; Design-build; Design-bid-build; Inputs; Outputs
资金
- Center of Construction Industry Studies (CCIS)
- Alfred P. Sloan Foundation
This study compares and analyzes the relationship of design-build (DB) and design-bid-build (DBB) project delivery methods with performance metrics of large highway projects (> $50 million). Project performance is measured in cost, schedule, and change orders on these two types of highway projects. This study also investigates associations between project characteristics (input variables) and project performance (output variables) of large highway projects. The performance comparison methodology used here is derived from work done on a Texas Department of Transportation study of the State Highway 130 Project. The study results show that the construction speed and project delivery speed per lane mile (or lane kilometer) of DB projects were significantly faster than that of DBB projects for this sample. The study also showed that out of 21 inputs analyzed, 14 inputs have statistically significant associations with one or more outputs of these projects. DOI: 10.1061/(ASCE)CO.1943-7862.0000390. (C) 2012 American Society of Civil Engineers.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据