JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
卷 138, 期 5, 页码 585-593出版社
ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000454
关键词
Designers; Errors; Costs; Procurement method; Project type
Design errors can adversely influence project performance and can contribute to failures, accidents, and loss of life. Although there has been a considerable amount of research that has examined design error causation, little is known about design error costs. With increasing emphasis placed on the use of nontraditional forms of procurement methods as a result of various government reports and the advent of Building Information Modelling there is a general perception that design error costs will be significantly less than those projects procured by traditional means. By using a questionnaire survey, estimates for design error costs were obtained from 139 projects. The mean direct and indirect costs for design errors were revealed to be 6.85 and 7.36% of contract value, respectively. Design error costs were found not to significantly vary with procurement method and project type used. Although the research provides invaluable insights into practitioners' perceptions of design errors costs, their actual costs remain relatively unexplored. DOI: 10.1061/(ASCE)CO.1943-7862.0000454. (C) 2012 American Society of Civil Engineers.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据