Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000487

关键词

Fast track; Preproject planning; Constructability; Alignment

资金

  1. CII

向作者/读者索取更多资源

A fast-track project delivery strategy is designed to leverage the ability to execute the design, procurement, and construction phases simultaneously to substantially reduce the overall project duration. The successful execution of the design phase in fast-track projects is especially challenging because the concurrent execution of design and construction interferes with the inherently iterative nature of the design process. In this research, it was hypothesized that a correlation exists between the use of some of the Construction Industry Institute (CII) best practices and the performance of design phase in fast-track projects. Analysis of the performance of the design phase in 31 fast-track projects revealed a statistically significant correlation between performance of the design phase and front-end planning, alignment, constructability, and change management. The results of quantitative analysis are supported by qualitative analysis of data, opinion of experts from industry, and academia. The projects analyzed in the study were executed by CII member companies with experience and knowledge of using the best practices effectively. DOI: 10.1061/(ASCE)CO.1943-7862.0000487. (C) 2012 American Society of Civil Engineers.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据