4.5 Article

Selecting Appropriate Project Delivery System: Fuzzy Approach with Risk Analysis

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000190

关键词

Project delivery systems; Fuzzy multiattribute decision making; Fuzzy TOPSIS; Risk attitude; Risk analysis

向作者/读者索取更多资源

The selection of an appropriate project delivery system that suits all project and owner needs is one of the key decisions to a successful project. Therefore, this decision should be made based on thorough analysis. In this paper, a fuzzy multiattribute decision-making (FMADM) model is developed. The model accounts for uncertainties and imprecision in the decision space as well as fuzziness in the nature of the decision attributes. The model utilizes fuzzy decision-making approach in order to evaluate the membership function corresponding to the utility of each project delivery alternative. Project delivery system alternatives are ranked using fuzzy technique for order preference by similarity to ideal solution (TOPSIS) method based on their utility membership functions and by evaluating the distance of each project delivery alternative from fuzzy ideal solutions. In the TOPSIS method, alternatives are ranked based on their closeness coefficient (CC). In addition, the risk attitude of the decision maker is considered in the model by using derived utility membership functions corresponding to the risk attitude of the decision maker. The model is applied to a petrochemical project as a case study. In the case study, the model outcome that ranked Turnkey system as the best system conforms to the lessons learned by the decision maker from several past projects. Moreover, sensitivity analysis is done in the case study. The results show the significant value of the FMADM model for selecting appropriate project delivery system for projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据