4.5 Article

Best-value model based on project specific characteristics

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9364(2008)134:3(179)

关键词

-

向作者/读者索取更多资源

Best-value becomes a well known procurement practice in many states in the country. The objective of this transformation from the old practice of lowest bid to best-value is to increase the value added to the project for each dollar added. This paper discusses a new concept of best-value modeling that is unique and tailored to each project. The model uses records of past projects to obtain specific evaluation criteria, from which a best-value score is determined for each contractor. Primary parameters that impact contractor selection are identified and analyzed based on which best-value model is designed. Data are collected from groups of experts in the Minnesota Department of Transportation. Two application methods are used to assess the best-value: (1) the weighted average method; and (2) the analytic hierarchy process. Although the paper is written to assist government agencies in selecting the best contractor(s), the research results shared in this paper are relevant to both academics and practitioners. The paper provides practitioners with a tool for ranking contractors based on best-value and provides academics with selection parameters, a model to evaluate this best-value, and a methodology of quantifying the qualitative effect of subjective factors.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据