4.6 Article

AN INTEGRATED FRAMEWORK FOR REDUCING PRECAST FABRICATION INVENTORY

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Engineering, Civil

GLOBAL OPTIMIZATION OF GRILLAGES USING SIMULATED ANNEALING AND HIGH PERFORMANCE COMPUTING

Dmitrij Sesok et al.

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT (2010)

Article Engineering, Civil

PRECAST CONCRETE SYSTEMS IN DEVELOPING VS. INDUSTRIALIZED COUNTRIES

Gul Polat

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT (2010)

Article Engineering, Civil

CONTRACTOR PREQUALIFICATION MODEL USING FUZZY SETS

Edyta Plebankiewicz

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT (2009)

Article Robotics

A multi-objective strategy in genetic algorithms for gene selection of gene expression data

Mohd Saberi Mohamad et al.

ARTIFICIAL LIFE AND ROBOTICS (2009)

Article Construction & Building Technology

Dynamic prediction of project success using artificial intelligence

Chien-Ho Ko et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2007)

Article Engineering, Civil

Example of a Hybrid Life-Cycle Assessment of Construction Processes

Melissa Bilec et al.

JOURNAL OF INFRASTRUCTURE SYSTEMS (2006)

Review Computer Science, Artificial Intelligence

A survey on analysis and design of model-based fuzzy control systems

Gang Feng

IEEE TRANSACTIONS ON FUZZY SYSTEMS (2006)

Article Construction & Building Technology

Effects of delivery systems on change order size and frequency in mechanical construction

DR Riley et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2005)

Article Business

Flowshop scheduling model for bespoke precast concrete production planning

Vacharapoom Benjaoran et al.

CONSTRUCTION MANAGEMENT AND ECONOMICS (2005)

Article Automation & Control Systems

Incorporating fuzzy approaches for production planning in complex industrial environments:: the roll shop case

B Adenso-Díaz et al.

ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE (2004)

Article Construction & Building Technology

Constraint programming approach to-precast production scheduling

WT Chan et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2002)

Article Construction & Building Technology

GA-based resource-constrained flow-shop scheduling model for mixed precast production

SS Leu et al.

AUTOMATION IN CONSTRUCTION (2002)

Article Business

Fuzzy operator allocation for balance control of assembly lines in apparel manufacturing

PCL Hui et al.

IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT (2002)

Article Construction & Building Technology

Just-in-time management of precast concrete components

LS Pheng et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2001)

Article Construction & Building Technology

Optimal repetitive scheduling model with shareable resource constraint

SS Leu et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2001)