4.6 Article

AN INTEGRATED FRAMEWORK FOR REDUCING PRECAST FABRICATION INVENTORY

期刊

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
卷 16, 期 3, 页码 418-427

出版社

VILNIUS GEDIMINAS TECH UNIV
DOI: 10.3846/jcem.2010.48

关键词

Precast fabrication; demand variability; inventory; scheduling

资金

  1. National Science Council (Taiwan) [NSC 94-2218-E-212-011, NSC 95-2221-E-212-051, NSC 96-2221-E-212-020, NSC 97-2221-E-020-036-MY2]

向作者/读者索取更多资源

Precast fabricators strive for business success on delivering products on time. To achieve this goal, fabricators start fabrication once they receive design information. However, this practice results in finished goods inventory which is regarded as waste. The objective of this study is to develop a framework for precast fabricators to reduce the inventory. The framework consists of three components. The first time buffer evaluation is used to avoid fabricators losing capacity by considering demand variability. The second component, due date adjustment, shifts production curve closer to erection dates to reduce inventory. The third scheduling component arranges production sequences to achieve multi-objectives using genetic algorithms. One real case is experimented to demonstrate the effectiveness of the proposed framework. The application results show that the developed framework can reduce the level of finished goods inventory without changing production resources.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据