JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING
卷 6, 期 5, 页码 559-571出版社
JAPAN SOC MECHANICAL ENGINEERS
DOI: 10.1299/jamdsm.6.559
关键词
Robust Scheduling; Resource-Constrained Project; Stability; Time Buffer; Uncertainty
Robust scheduling is aiming at constructing proactive schedules capable of dealing with multiple disruptions during project execution. Insertion a time buffer, before an activity start time, is a method to improve the robustness (stability) of a baseline schedule. In this paper, we introduce new heuristics for inserting time buffers in a given baseline schedule while the project due date is predefined and stochastic activity duration is considered. Computational results obtained from a set of benchmark projects show that the proposed heuristics capable of generating proactive schedules with acceptable quality and solution robustness.