4.7 Article

Optimisation of PM scheduling for multi-component systems - a simulated annealing approach

期刊

INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE
卷 46, 期 7, 页码 1199-1207

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207721.2013.815822

关键词

optimisation; multi-component systems; reliability; simulated annealing; availability; preventive maintenance

资金

  1. Iranian Oil Pipeline and Telecommunication Company (IOPTC), Tehran, Iran

向作者/读者索取更多资源

Proper planning of preventive maintenance (PM) is crucial in many industries such as oil transmission pipelines, automotive and food industries. A critical decision in the PM plans is to determine frequencies and types of maintenance actions in order to achieve a certain level of system availability with a minimum total cost. In this paper, we consider the problem of obtaining availability-based non-periodic optimal PM planning for systems with deteriorating components. The objective is to sustain a certain level of availability with the minimal total maintenance-related costs. In the proposed approach, the planning horizon is divided into some inspection periods of equal intervals. For any given interval, a decision must be made to perform one of the three actions on each component; inspection, preventive repair and preventive replacement. Any of these activities has different effects on the reliability of the components and the corresponding distinct costs based on the required recourses. The cost function includes the cost for repair, replacement, system downtime and random failures. System availability and PM resources are the main constraints considered. Since the proposed model is combinatorial in nature involving non-linear decision variables, a simulated annealing algorithm is employed to provide good solutions within a reasonable time.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据