Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 57, 期 10, 页码 3003-3019

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2018.1521532

关键词

AGV-based manufacturing system; flow process; genetic algorithms; prefabricated bathroom unit; space-constrained scheduling

资金

  1. National Research Foundation Singapore [NRF IIP] [M4098029]

向作者/读者索取更多资源

In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Although line balancing helps to reduce the queues, the system is still prone to deadlock due to limited space. Hence, in order to prevent deadlock situations, the production start times of PBUs have to be controlled. A genetic algorithm is proposed with the objective to decide operation for each workstation and to choose a start time for each PBU. The project duration is minimised while satisfying precedence relations and resource availabilities. A rule-based simulation approach is used to estimate the fitness value of every GA chromosomes. At last, the experiment based on data from an industrial project shows that the proposed algorithm has the potential to guide the real practice.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据