4.7 Article

Reheat furnace scheduling with energy consideration

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 53, 期 6, 页码 1642-1660

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2014.919418

关键词

reheat furnace scheduling; constraint propagation; scatter search; energy saving

资金

  1. State Key Program of National Natural Science Foundation of China [71032004]
  2. Fund for Innovative Research Groups of the National Natural Science Foundation of China [71321001]
  3. National 863 High-Tech Research and Development Program of China [2013AA040704]

向作者/读者索取更多资源

This paper focuses on the reheat furnace scheduling problem (RFSP) which is to assign the slabs to the reheat furnace, make the slab sequence for each furnace and determine the feed-in time and the residence time for each slab in order to reduce the unnecessary energy consumption reflected by minimising the objective under consideration. Differing from the traditional scheduling problem, the actual residence time of each slab in RFSP needs to be decided and it is correlated with its neighbour slabs in the reheating sequence of the same furnace. Firstly, the RFSP is formulated as a mixed integer programming model with consideration of the practical production requirements. The strong NP-hardness of the problem motivates us to develop a scatter search (SS) algorithm to solve the problem approximately. The SS algorithm is improved by constraint propagation (CP) for filtering the infeasible solutions in both the generation of the initial solutions and the improvement procedure. To verify the algorithm performance, the proposed algorithm is compared with ILOG CP Optimiser for small-scaled problems and the standard SS, genetic algorithm (GA) for large-scaled practical problems, respectively. The computational results illustrate that the proposed algorithm is relatively effective and efficient.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据