4.7 Article

A scheduling model for the refurbishing process in recycling management

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 51, 期 23-24, 页码 7120-7139

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2013.842024

关键词

refurbishing flowshop; operation-based performance measure; weighted total completion time; approximation algorithm

资金

  1. National Science Council of Taiwan [NSC100-2410-H-009-015-MY2]

向作者/读者索取更多资源

We propose from the perspective of operations scheduling a novel model of the refurbishing process in recycling management. We model the refurbishing process as a two-stage flowshop that dismantles products into parts in stage one and refurbishes the parts on dedicated machines in stage two. The model also features that the performance measure of a schedule is defined by operation-based completion times, which is different from the job-based performance measures traditionally adopted in the scheduling literature. We analyse the optimality properties and computational complexity of some special cases of the problem. We derive lower bounds on the optimal solution based on a disaggregation technique and the assignment problem, and develop dominance rules incorporating estimates of the effects of partial schedules on unscheduled jobs. We present a heuristic approach, based on LP relaxation, and analyse its performance ratio. We also develop two metaheuristic algorithms, based on iterated local search and ant colony optimisation, to produce approximate solutions. The results of computational experiments show that the metaheuristics generate better solutions than the simple weighted shortest processing time dispatching rule, and the NEH-based and CDS-based algorithms, which are commonly deployed to treat the classical two-machine flowshop scheduling problem.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据