4.7 Article

An analytical model for service level and tardiness in a single machine MTO production system

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 49, 期 7, 页码 1827-1850

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207541003660176

关键词

service level; tardiness; production economics; production management; queuing theory; MTO

资金

  1. Austrian Science Fund (FWF) [L 534] Funding Source: researchfish

向作者/读者索取更多资源

In this paper an analytical model to calculate service level, FGI and tardiness for a make-to-order (MTO) production system based on the production leadtime, utilisation and WIP is presented. The distribution of customer required leadtime is linked to the already available equations for an M/M/1 production system from queuing theory. Explicit equations for service level, FGI, FGI leadtime and tardiness are presented for an M/M/1 production system within an MTO environment. For a G/G/1 production system an approximation based extension is provided - discussing the influence of variation in the inter-arrival and processing time distribution in this framework. Moreover, the integration of a work ahead window (WAW) work release policy is discussed. Based on a numerical study, a high potential to decrease FGI (up to 97% FGI reduction) when applying such a WAW strategy is found and it is shown that the higher the targeted service level is, the higher the FGI reduction potential. The paper contributes to a better understanding of the relationship between customer required leadtime distribution and the M/M/1 production system. By applying this model a decision maker can base his capacity investment decisions on the service level and expected tardiness for certain levels of FGI and WIP and can additionally define the optimal WAW policy.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据