4.7 Article

Mathematical programming model for centralised master planning in ceramic tile supply chains

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 48, 期 17, 页码 5053-5074

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207540903055701

关键词

master planning; supply chain; ceramic sector; mixed-integer linear programming model

资金

  1. Science and Technology Ministry of the Spanish Government

向作者/读者索取更多资源

The object of this article is to develop a centralised replenishment, production, and distribution model for ceramic tile supply chains. These supply chains are assumed to be multi-item, multi-supplier, multi-facility, multi-type and multi-level distribution centres. The model deals with multi-period master planning where sourcing considerations for replenishments, production facilities, and distribution centres are important to maximise an objective function involving the total net profit. This model is deterministic and has been formulated as a mixed-integer linear programming (MILP) model. An example based on modifications of real-world industrial problems is presented.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据