4.7 Article

Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Review Management

A survey of scheduling problems with setup times or costs

Ali Allahverdi et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)

Article Engineering, Industrial

Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times

S. Hamed Hendizadeh et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2008)

Article Computer Science, Cybernetics

Solving part-type selection and operation allocation problems in an FMS: An approach using constraints-based fast simulated annealing algorithm

Manoj Kumar Tiwari et al.

IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS (2006)

Article Engineering, Industrial

Sequence-dependent group scheduling problems in flexible flow shops

R Logendran et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2006)

Article Engineering, Industrial

An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system

SR Das et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)

Article Computer Science, Interdisciplinary Applications

Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups

PM França et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2005)

Article Engineering, Industrial

Heuristics for scheduling sequence-dependent set-up jobs in flow line cells

V Reddy et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2003)

Article Management

Scheduling a flowline manufacturing cell with sequence dependent family setup times

JE Schaller et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2000)