4.7 Article

Multi-agent based beam search for intelligent production planning and scheduling

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 48, 期 11, 页码 3319-3353

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207540902810502

关键词

production planning; scheduling; multi-agent systems; beam search; decision making; knowledge representation

向作者/读者索取更多资源

Production planning and scheduling is a long standing research area of great practical value, while industrial demand for production planning and scheduling systems is acute. Regretfully, most research results are seldom applied in industry because existing planning and scheduling methods can barely meet the requirements for practical applications. This paper identifies four major requirements, namely generality, solution quality, computation efficiency, and implementation difficulty, for practical production planning and scheduling methods. Based on these requirements, method, a multi-agent based beam search (MABBS), is developed. It seamlessly integrates the multi-agent system (MAS) method and beam search (BS) method into a generic multi-stage multi-level decision making (MSMLDM) model to systematically address all the four requirements within a unified framework. A script language, called EXASL, and an open software platform are developed to simplify the implementation of the MABBS method. For solving complex real-world problems, an MABBS-based prototype production planning, scheduling and execution system is developed. The feasibility and effectiveness of this study is demonstrated with the prototype system and computation experiments.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据