Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint

期刊

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ijpe.2009.03.012

关键词

Assembly flowshop scheduling; Component available time; Heuristic; Branch-and-bound

向作者/读者索取更多资源

This paper considers a 2-stage assembly flowshop scheduling problem where each job is assembled with two types of components and makespan is the objective measure. For the assembly, one type of the components is outsourced subject to job-dependent lead time but the other type is fabricated in-house, at the first stage. The problem is shown to be NP-complete in the strong sense. Some solution properties are characterized, based on which three heuristic algorithms are derived. A branch-and-bound algorithm is also derived by use of the associated three lower bounds and several dominance properties. Numerical experiments are conducted to evaluate the performances of the proposed branch-and-bound and heuristic algorithms. (C) 2009 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据