4.6 Article

Simultaneous determination of multiproduct batch and full truckload shipment schedules

期刊

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ijpe.2008.08.015

关键词

Economic lot scheduling; Full truckload shipments; Supply chain coordination; Inventory model

向作者/读者索取更多资源

A fundamental premise of the well-known economic lot-scheduling problem (ELSP) is that the finished products are consumed at continuous rates, i.e. their respective cycle's supply chains, inventories are depleted on the basis of unit transactions. In today however, employing complex distribution networks, finished goods inventories from manufacturing plants are usually shipped in bulk to succeeding stages along the distribution process. Moreover, existing transport economies often tend to favor full truckload (TL), rather that partial or less than truckload (LTL) shipments, for economical movement of such goods. The scenario examined here, however, involves a set of products, for which individual TL shipments are uneconomical. As a remedy, we construct a model for taking advantage of TL rates by combining LTL quantities of the items into a full load. We adopt the common cycle approach for the ELSP, in conjunction with a common replenishment cycle, as a coordination mechanism that is simple to analyze and implement. This is integrated with a periodic full truckload shipping schedule. Such effective coordination of production and shipment schedules is likely to result in a more streamlined supply chain. The concepts developed are illustrated through a simple numerical example. (C) 2008 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据