4.6 Article

Integrated scheduling of handling equipment at automated container terminals

期刊

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ijpe.2007.05.015

关键词

integrated scheduling; automated container terminal; genetic algorithm; bipartite maximum matching

向作者/读者索取更多资源

To improve the productivities of an automated container terminal, it is important to schedule different types of handling equipment in an integrated way. A mixed-integer programming model, which considers various constraints related to the integrated operations between different types of handling equipment, is formulated. This study proposes a heuristic method, called multi-layer genetic algorithm (MLGA) to obtain the near-optimal solution of the integrated scheduling problem and an improved heuristic algorithm, called genetic algorithm plus maximum matching (GAPM), to reduce the computation complexity of the MLGA method. The performance of GAPM is also compared with that of the MLGA method. (C) 2007 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据