4.6 Article

Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times

期刊

出版社

ELSEVIER
DOI: 10.1016/j.ijpe.2007.02.031

关键词

scheduling; flowline manufacturing cell; meta-heuristics; flowshop; sequence dependent family setup times

向作者/读者索取更多资源

This paper presents various Tabu Search (TS) based meta-heuristics for scheduling the part families and jobs within each family in a flowline manufacturing cell (also called a flowshop) with sequence dependent family setup times to minimize makespan. Concepts of Elitism and the acceptance of worse moves from simulated annealing (SA) are examined in the proposed meta-heuristics to improve intensification and diversification. The effectiveness and efficiency of the proposed TS based meta-heuristics are compared against the best meta-heuristic and heuristic algorithms reported so far for this problem on several test problems. Computational results show that the best proposed TS based meta-heuristic is quite effective in minimizing makespan in a reasonable amount of CPU time. (C) 2007 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据