期刊
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
卷 113, 期 1, 页码 495-497出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.ijpe.2007.10.007
关键词
hybrid flowshop; lower bounds
The hybrid flowshop scheduling problem requires minimizing the makespan in a serial multiple-stage manufacturing system, where each stage consists of parallel identical machines. The purpose of this note is to pinpoint several inaccuracies contained in a recent paper and to propose a valid lower bound. (C) 2007 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据