This paper presents a novel approach to optimal placement of Phasor Measurement Units (PMUs) for state estimation. At first, an optimal measurement set is determined to achieve full network observability during normal conditions, i.e. no PMU failure or transmission line outage. Then, in order to consider contingency conditions, the derived scheme in normal conditions is modified to maintain network observability after any PMU loss or a single transmission line outage. Observability analysis is carried out using topological observability rules. A new rule is added that can decrease the number of required PMUs for complete system observability. A modified Binary Particle Swarm Optimization (BPSO) algorithm is used as an optimization tool to obtain the minimal number of PMUs and their corresponding locations while satisfying associated constraint. Numerical results on different IEEE test systems are presented to demonstrate the effectiveness of the proposed approach. (C) 2010 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据