相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Total flow time minimization in a flowshop sequence-dependent group scheduling problem
Nasser Salmasi et al.
COMPUTERS & OPERATIONS RESEARCH (2010)
Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system
R. Tavakkoli-Moghaddam et al.
EXPERT SYSTEMS WITH APPLICATIONS (2010)
Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach
N. Karimi et al.
EXPERT SYSTEMS WITH APPLICATIONS (2010)
A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers
Xianpeng Wang et al.
COMPUTERS & OPERATIONS RESEARCH (2009)
An effective hybrid genetic algorithm for flow shop scheduling with limited buffers
L Wang et al.
COMPUTERS & OPERATIONS RESEARCH (2006)
Sequence-dependent group scheduling problems in flexible flow shops
R Logendran et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2006)
Flowshop-scheduling problems with makespan criterion: a review
SR Hejazi et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2005)
Group scheduling in flexible flow shops
R Logendran et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)
A heuristic to minimize makespan of cell scheduling problem
M Solimanpur et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2004)
Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times
M Pranzo
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)
A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage
HW Thornton et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)
A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities
B Wardono et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)
Flow-shop problems with intermediate buffers
P Brucker et al.
OR SPECTRUM (2003)
A new lower bound for the flow shop group scheduling problem
J Schaller
COMPUTERS & INDUSTRIAL ENGINEERING (2001)
Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
T Sawik
MATHEMATICAL AND COMPUTER MODELLING (2000)
Two-machine flowshop group scheduling problem
DL Yang et al.
COMPUTERS & OPERATIONS RESEARCH (2000)