相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Multi-objective artificial bee colony for interval job shop scheduling with flexible maintenance
Deming Lei
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2013)
Scheduling a single machine with multiple preventive maintenance activities and position-based deteriorations using genetic algorithms
Byung Soo Kim et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2013)
A joint model of production scheduling and predictive maintenance for minimizing job tardiness
Ershun Pan et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2012)
Group scheduling with independent setup times, ready times, and deteriorating job processing times
Ji-Bo Wang et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2012)
Scheduling fuzzy job shop with preventive maintenance through swarm-based neighborhood search
Demion Lei
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2011)
Total flow time minimization in a flowshop sequence-dependent group scheduling problem
Nasser Salmasi et al.
COMPUTERS & OPERATIONS RESEARCH (2010)
Scheduling flowshops with condition-based maintenance constraint to minimize expected makespan
Ehram Safari et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2010)
An efficient architecture for scheduling flexible job-shop with machine availability constraints
E. Moradi et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2010)
Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
Shih-Wei Lin et al.
COMPUTERS & OPERATIONS RESEARCH (2009)
Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops
M. Zandieh et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2009)
Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
Shih-Wei Lin et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2009)
Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
A. Berrichi et al.
JOURNAL OF INTELLIGENT MANUFACTURING (2009)
A two-machine flowshop scheduling problem with a separated maintenance constraint
Dar-Li Yang et al.
COMPUTERS & OPERATIONS RESEARCH (2008)
Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
Jen-Shiang Chen
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times
S. Hamed Hendizadeh et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2008)
Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
Jin Yulan et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2008)
Considering scheduling and preventive maintenance in the flowshop sequencing problem
Ruben Ruiz et al.
COMPUTERS & OPERATIONS RESEARCH (2007)
A study on flowshop scheduling problem combining Taguchi experimental design and genetic algorithm
Bor-Wen Cheng et al.
EXPERT SYSTEMS WITH APPLICATIONS (2007)
A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint
J Breit
COMPUTERS & OPERATIONS RESEARCH (2006)
Sequence-dependent group scheduling problems in flexible flow shops
R Logendran et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2006)
Group scheduling in flexible flow shops
R Logendran et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)
Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups
PM França et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2005)
Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
N Sortrakul et al.
COMPUTERS IN INDUSTRY (2005)
Scheduling of FMSs with information delays: A simulation study
R Caprihan et al.
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS (2005)
Minimizing the makespan for the flow shop scheduling problem with availability constraints
R Aggoune
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
H Allaoui et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2004)
Heuristics for scheduling sequence-dependent set-up jobs in flow line cells
V Reddy et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2003)
Two-machine flow shops with limited machine availability
W Kubiak et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)
Heuristic algorithms for the two-machine flowshop with limited machine availability
J Blazewicz et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2001)
An effective hybrid optimization strategy for job-shop scheduling problems
L Wang et al.
COMPUTERS & OPERATIONS RESEARCH (2001)
Scheduling with limited machine availability
G Schmidt
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2000)
Scheduling a flowline manufacturing cell with sequence dependent family setup times
JE Schaller et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2000)