4.6 Article

A two-stage stochastic programming project scheduling approach to production planning

出版社

SPRINGER LONDON LTD
DOI: 10.1007/s00170-011-3794-4

关键词

Production planning; Stochastic programming; Project scheduling

资金

  1. MCM S.p.A
  2. XVII Executive Programme of Scientific and Technological Cooperation, Republic of Hungary
  3. XVII Executive Programme of Scientific and Technological Cooperation, Republic of Italy

向作者/读者索取更多资源

In engineering-to-order (ETO) or manufacturing-to-order (MTO) systems producing highly customized items, the high level of customization, together with long flow times, forces the production plan to be defined before information on items customization, and details on the manufacturing activities are completely disclosed. Due to the partial available information, the production plan must provide a robust schedule of the activities and of the resources utilization, trying to incorporate a certain degree of anticipation of uncertainty. This paper proposes a two-stage stochastic programming project scheduling approach to support production planning in ETO/MTO system. The approach provides a baseline production plan together with a set of revisions of the plan to react to the occurrence of uncertain events. A scenario-based approach is used to model the changes affecting the characteristics of the activities to be processed. The proposed approach is tested on random-generated instances and on a real manufacturing system producing machining centers.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据