4.6 Article

Group scheduling with independent setup times, ready times, and deteriorating job processing times

出版社

SPRINGER LONDON LTD
DOI: 10.1007/s00170-011-3639-1

关键词

Scheduling; Single machine; Deteriorating jobs; Group technology; Ready time

资金

  1. Research Grants Council of the Hong Kong Special Administrative Region, China [PolyU 5170/11E]
  2. National Natural Science Foundation of China [11001181]
  3. Science Research Foundation of Shenyang Aerospace University [201011Y]

向作者/读者索取更多资源

In this paper we investigate a single machine scheduling problem with deteriorating jobs and group technology assumption. By deteriorating jobs and group technology assumption, we mean that job processing times are simple linear functions of its starting times. The group setup times are assumed to be known and fixed. We attempt to minimize the makespan with ready times of the jobs. For a special case, we show that the problem can be solved in polynomial time when deterioration and group technology are considered simultaneously.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据