相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints
Shih-Wei Lin et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2011)
Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion
Chuyang Wang et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)
Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic
Kuo-Ching Ying et al.
EXPERT SYSTEMS WITH APPLICATIONS (2010)
An efficient heuristic for total flowtime minimisation in no-wait flowshops
Jose Manuel Framinan et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2010)
Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
Zne-Jung Lee et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2010)
Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups
Kuo-Ching Ying et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2010)
A DE-based approach to no-wait flow-shop scheduling
B. Qian et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2009)
A fast hybrid tabu search algorithm for the no-wait job shop problem
Wojciech Bozejko et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2009)
Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
Shih-Wei Lin et al.
COMPUTERS & OPERATIONS RESEARCH (2009)
Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic
Kuo-Ching Ying et al.
EXPERT SYSTEMS WITH APPLICATIONS (2009)
Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects
Kuo-Ching Ying et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2009)
Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
Shih-Wei Lin et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2009)
An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks
K-C Ying
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2009)
A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
Quan-Ke Pan et al.
COMPUTERS & OPERATIONS RESEARCH (2008)
A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem
A. R. Rahimi-Vahed et al.
ENGINEERING OPTIMIZATION (2008)
Single-machine scheduling with family setup times in a manufacturing system
Wen-Jinn Chen
ENGINEERING OPTIMIZATION (2008)
An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
Ruben Ruiz et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times
S. Hamed Hendizadeh et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2008)
Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic
Kuo-Ching Ying
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2008)
A hybrid discrete particle swarm optimization algorithm for the no-wait flow shop scheduling problem with makespan criterion
Quan-Ke Pan et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2008)
Solving single-machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics
Shih-Wei Lin et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2007)
Multi-heuristic desirability ant colony system heuristic for non-permutation flowshop scheduling problems
Kuo-Ching Ying et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2007)
A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
Ruben Ruiz et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)
Scheduling on a single machine with family setups to minimize total tardiness
Jeffrey Schaller
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2007)
An effective hybrid particle swarm optimization for no-wait flow shop scheduling
Bo Liu et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2007)
Solving part-type selection and operation allocation problems in an FMS: An approach using constraints-based fast simulated annealing algorithm
Manoj Kumar Tiwari et al.
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS (2006)
Sequence-dependent group scheduling problems in flexible flow shops
R Logendran et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2006)
Minimizing flow time in a flow-line manufacturing cell with family setup times
JND Gupta et al.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2006)
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
R Logendran et al.
COMPUTERS & OPERATIONS RESEARCH (2006)
An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
SR Das et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)
Group scheduling in flexible flow shops
R Logendran et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)
Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups
PM França et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2005)
Scheduling two-machine no-wait open shops to minimize makespan
CF Liaw et al.
COMPUTERS & OPERATIONS RESEARCH (2005)
A heuristic to minimize makespan of cell scheduling problem
M Solimanpur et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2004)
Approximative procedures for no-wait job shop scheduling
CJ Schuster et al.
OPERATIONS RESEARCH LETTERS (2003)
Heuristics for scheduling sequence-dependent set-up jobs in flow line cells
V Reddy et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2003)
Job-shop scheduling with blocking and no-wait constraints
A Mascis et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)
Group scheduling in a two-stage flowshop
WH Yang
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2002)
Two models for a family of flowshop sequencing problems
EF Stafford et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)
Scheduling a flowline manufacturing cell with sequence dependent family setup times
JE Schaller et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2000)