4.6 Article

Single-machine-based production scheduling model integrated preventive maintenance planning

出版社

SPRINGER LONDON LTD
DOI: 10.1007/s00170-009-2514-9

关键词

Production scheduling; Preventive maintenance; Tardiness; Weight; Effective age

资金

  1. National Natural Science Foundation of China [70671065, 50875168, 50821003]
  2. Programme of Introducing Talents of Discipline to Universities [B06012]
  3. National High-Tech Research and Development Plan [2007BAF10B00]

向作者/读者索取更多资源

Manufacturing and production plants operate physical machine that will deteriorate with increased usage and time. Maintenance planning which can keep machines in good operation is thus required for smooth production. However, in previous research, production scheduling and maintenance planning are usually performed individually and not studied as an integrated model. In order to balance the trade-offs between them, this study proposes an integrated scheduling model by incorporating both production scheduling and preventive maintenance planning for a single-machine problem with the objective of minimizing the maximum weighted tardiness. In this model, a variable maintenance time subjected to machine degradation is considered. Finally, a numerical example using this improved production scheduling model is shown. The computational results prove its efficiency.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据