4.6 Article

Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm

期刊

出版社

SPRINGER LONDON LTD
DOI: 10.1007/s00170-010-2583-9

关键词

Scheduling; Sequencing; Flexible manufacturing system; Ant colony optimization algorithm

向作者/读者索取更多资源

Many optimization problems from the manufacturing systems are very complex in nature and quite hard to solve by conventional optimization techniques. The theme of this paper is to generate an active schedules and optimal sequence of job and tool that can meet minimum makespan schedule for the flexible manufacturing system. It consists of similar work center which is capable of doing many operations. The tools are stored in a common tool magazine that shares with and serves for several work centers to reduce the cost of duplicating tools in each and every work center. This type of manufacturing system is used for a manufacturing environment in which tools are expensive. To achieve the objective, the jobs and tools are sequenced and scheduled. In this work, non-traditional optimization technique such as ant colony optimization (ACO) algorithm are proposed to derive near-optimal solutions which adopt the Extended Giffler and Thompson algorithm for active feasible schedule generation. In this paper, the proposed algorithm is used for solving number of problems taken from the literature. The results available for the various existing algorithms are compared with results obtained by the ACO algorithm. The analysis reveals that ACO algorithm provides better solution with reasonable computational time.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据