期刊
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
卷 50, 期 5-8, 页码 811-822出版社
SPRINGER LONDON LTD
DOI: 10.1007/s00170-010-2543-4
关键词
Project scheduling; Time-cost trade-off; Hybrid approach; Cutting plane; Optimization
This paper develops a hybrid approach for stochastic time-cost trade-off problem (STCTP) in PERT networks of project management, where activities are subjected to linear cost functions. The main objective of proposed approach is to improve the project completion probability in a prespecified deadline from a risky value to a confident predefined probability. To this end, we construct a nonlinear mathematical program with decision variables of activity mean durations, in which the objective function is concerned with minimization of project crashing direct cost. In order to solve the constructed model, we present a hybrid approach based on cutting plane method and Monte Carlo (MC) simulation. To illustrate the process of proposed approach, the approach was coded using MATLAB 7.6.0 and two illustrative examples are discussed. The results obtained from the computational study show that the proposed algorithm is an effective approach for the STCTP.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据