4.7 Article

A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem

期刊

INFORMATION SCIENCES
卷 277, 期 -, 页码 680-693

出版社

ELSEVIER SCIENCE INC
DOI: 10.1016/j.ins.2014.02.155

关键词

Particle swarm optimization; Hyper-heuristics; Project scheduling; Resource constrained project scheduling problem

向作者/读者索取更多资源

In this paper, we propose a particle swarm optimization (PSO) based hyper-heuristic algorithm for solving the resource constrained project scheduling problem (RCPSP). To the best of our knowledge, this is the first attempt to develop a PSO hyper-heuristic and apply to the classic RCPSP. The hyper-heuristic works as an upper-level algorithm that controls several low-level heuristics which operate to the solution space. The solution representation is based on random keys. Active schedules are constructed by the serial scheduling generation scheme using the priorities of the activities which are modified by the low-level heuristics of the algorithm. Also, the double justification operator, i.e. a forward-backward improvement procedure, is applied to all solutions. The proposed approach was tested on a set of standard problem instances of the well-known library PSPLIB and compared with other approaches from the literature. The promising computational results validate the effectiveness of the proposed approach. (C) 2014 Elsevier Inc. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据