Deadline division-based heuristic for cost optimization in workflow scheduling

期刊

INFORMATION SCIENCES
卷 179, 期 15, 页码 2562-2575

出版社

ELSEVIER SCIENCE INC
DOI: 10.1016/j.ins.2009.01.035

关键词

Grid computing; Workflow; Directed acyclic graph; Cost/time tradeoff; Heuristic

向作者/读者索取更多资源

Cost optimization for workflow applications described by Directed Acyclic Graph (DAG) with deadline constraints is a fundamental and intractable problem on Grids. In this paper, an effective and efficient heuristic called DET (Deadline Early Tree) is proposed. An early feasible schedule for a workflow application is defined as an Early Tree. According to the Early Tree, all tasks are grouped and the Critical Path is given. For critical activities, the optimal cost solution under the deadline constraint can be obtained by a dynamic programming strategy, and the whole deadline is segmented into time windows according to the slack time float. For non-critical activities, an iterative procedure is proposed to maximize time windows while maintaining the precedence constraints among activities. In terms of the time window allocations, a local optimization method is developed to minimize execution costs. The two local cost optimization methods can lead to a global near-optimal solution. Experimental results show that DET outperforms two other recent leveling algorithms. Moreover, the deadline division strategy adopted by DET can be applied to all feasible deadlines. (C) 2009 Elsevier Inc. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据